Contact one of our experts 0115 958 6872 Search Site
Case Study 21 Main

We arrange funding for the purchase of a ground mounted solar panels

A third generation dairy farm with 500 cows needs to reduce their overhead costs.

The business supplies organic milk to a range of different customers.

Our specialist renewable team arranged the purchase and installation of a 150kw ground mounted solar panel to reduce the electricity costs of the farm.

We arranged £120K over an 84-month term. The customer was happy with the asset as based on the 25-year predictions provided by the supplier the electricity saving would offset 77% of the loan repayments.

If you have an enquiry about this case study, please email[email protected], call 0115 958 6872 or fill in an enquiry form below.

Business Name

MAF Insights

View All